Raipur: Chief Minister Bhupesh Baghel told the citizens of Raigad district, I assure you that the bad roads will be built as soon as the rains end.

Spread the love

260 km of roads will be constructed in Raigad at a cost of 467 crores

Raipur, 14 September 2022

260 km of roads will be constructed in Raigad at a cost of 467 crores260 km of roads will be constructed in Raigad at a cost of 467 croresChief Minister Shri Bhupesh Baghel has said that the work of making bad roads in Raigad district will be done as soon as the rains end. Addressing the villagers in village Chhak of Dharamjaygarh Vidhan Sabha, he said that I assure you that the bad roads of Raigad district will be made soon.

He said that PWD Secretary Shri Siddharth Komal Pardeshi has taken stock of all the bad roads and he himself too.

He said that PWD Secretary Shri Siddharth Komal Pardeshi has taken stock of all the bad roads and he himself too.
He said that PWD Secretary Shri Siddharth Komal Pardeshi has taken stock of all the bad roads and he himself too.He said that PWD Secretary Shri Siddharth Komal Pardeshi has taken stock of all the bad roads and he himself is also monitoring it continuously. It is noteworthy that there is a lot of pressure of heavy vehicles in Raigad district, so the condition of the roads will be improved after the rains. Secretary, Public Works Department, Mr. Siddarth Komal Pardeshi informed that 70 kms from Raigarh to Dharamjaigarh at a cost of 130 crores, 90 kms from
Kharsia-Chhal-Hati-Dharamjaygarh-Pathalgaon at a cost of 190 crores, Chal to Gharghoda at a cost of 48 crores. 23 km road from, Capitalpathra-Tamanar-Milupara 26 km road at a cost of 62 crore,Sarangarh-Barmakela-Sohela road 8 km at a cost of Rs.8.5 crore, Barmakela-Saria-Nadigaon road 18 km at a cost of Rs.7.5 crore, 15 kms from Gharghoda to Lailunga at a cost of 7 crores and 3 kms from Surajgarh to Padigaon at a cost of 6 crores will be constructed.